Settlement monitoring PDF. Print E-mail

1. Objectives of settlement monitoring/surveying?

 Settlement measurement, measuring of displacement of building ground slabs and construction works shall be executed in accordance with specific scheme for following objectives:

- Finalization of settlement values, absolute and relative displacements of ground slab and buildings against calculated data upon their design;

- Figure out causes of settlement, displacement and risk levels against normal working conditions of buildings and construction works. So, base on that proper solutions might be concluded for prevention of arising issues;

- Determination of typical necessary data in regard of stability of ground and construction works;

- Further verification and clarification of typical data related to the soil physical properties;

- Shall be used as data for checking of calculation methods, determination of settlement values, permissible limits of displacements for ground soil and other different construction works.

 

2. When shall settlement monitoring/control be executed? Which factors shall be figured out?

Settlement measurement, measuring of displacement of foundation of buildings and construction works shall be carried out during construction duration and shall be applied until stability of settlement and displacement are obtained. Displacement measuring, during operation of construction works, shall also be performed when appearing of big cracks or visible changes in service conditions of buildings and facilities.

During measurement of displacements of buildings and construction works following data shall be finalized (independently or in coincident):

- Vertical movement (settlement, deflection, convexity);

- Horizontal movement (displacement extent);

- Inclination;

- Cracks.

Related information

 

Related Codes and standards

 

Performed projects in connection with settlement monitoring and control

1. Construction works: VFC TOWER OFFICE

    Address: No. 29 Ton Duc Thang - District no. 1 - Ho Chi Minh city

    Project scale: 03 basements, 01 ground floor, 15 upper floors, area of 7200m2

 

2. Construction works: THAILAND HIGH-RISE BUILDING

   Address: No. 2290 National Road no. 1A, Trung My Tay ward, District no. 12, Ho Chi Minh city

 

 

 

 

 

 

 

 

 

 

  3.  Construction works: KHAI HOAN HIGH STANDARD APARTMENTS

     Address: No. 624 Lac Long Quan and 243/A5 Au Co - Ward no. 5 -  District no. 11 - Ho Chi Minh city

 

 

 

 

 

 

 

 

 

 

4. Construction works: HIGH-RISE BUILDING OFFICE FOR RENT

    Address: 117-119 Nguyen Van Troi, Ward no. 13, Phu Nhuan district, Ho Chi Minh city

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5. Construction works: HIGH-RISE BUILDING OFFICE FOR RENT

Address: 435 Hoang Van Thu – Tan Binh District – HCMC

Project scale: 1 Basement & 8 Storeies

 

 

 

 

 

 

 

 

 

 

 

6. Construction works: TERRA ROSSA

Address: Phong Phu Building, Nguyen Van Linh

Project scale: construction area 26.000 m2, 25 storeies (2 block) and 29 storeies (1 block).

 

 

 

 

 

 

 

 

7. Construction works: TECCO TOWER

Address: Linh Đong – Linh Đong Ward – Thu Duc District – HCMC

Project scale: 17 Storeies (2 block).

 

 

 

 

 

 

 

 

 

 

 

 

8. Construction works: CT PLAZA

Address: 60A Truong Son, Ward 2 – Tan Binh District – HCMC

Project scale: 2 Basement, 10 Storeies

 

 

bottom

Copyright © 2009 INTERNATIONAL CONSTRUCTION INSPECTION CONSULTANT JOINT STOCK COMPANY (ICCI)
Address: 198/9 Nguyen Thai Son, Ward no. 4, Go Vap district, Ho Chi Minh city
Powered by WAMP Co Ltd. | Thiet ke nha pho